Testing of centrifugal compressor
In the 1st half of 2014, HMS Group signed a contract for more than 6 billion rubles with one of the Russian oil & gas majors to deliver oil & gas equipment as part of a large-scale project, the “Liquid Hydrocarbon Project”, which is planned to be completed in 2016.
In December 2013, the company signed a 5.7 billion rubles contract to supply an integrated solution for a major Siberian gas field. According to the contract, HMS will design, manufacture, deliver, supervise and test the complex technological facility, including compressors, pumps, tanks and vessels, filters, coolers and other components. The project is planned to be completed in 2016.
Modular cluster pump station for “Buzachi Operating Ltd”, Kazakhstan
In September 2015, HMS Group signed a 3.5 billion rubles contract to deliver 5 high-pressure compressor units, intended for compression of separated associated gas. All units will be manufactured by Kazancompressormash and installed at an oil and gas condensate deposit, located in the Ural region of Russia.
Compressor station with liquid-ring compressor for Rosneft
In February 2016, the company signed a 2.8 billion rubles contract to produce a boosting compressor station. The station, based on 3 centrifugal-type compressor units with gas-turbine engines and intended for compression of low-pressure associated gas, will be manufactured by Kazancompressormash and installed at an oil and gas condensate deposit, located in the West Siberia. The project is to be completed by the end of 2016.
A month later, HMS signed a number of contracts for delivery and installation of technologically integrated solutions for two Siberian gas fields, worth 3.1 billion rubles. The company will deliver complex solutions for pumping of natural gas liquids and pumping of oil, wash-down water and rust preventive chemical. All units will be delivered by HMS Neftemash. These contracts are a follow-up to another project successfully completed recently.